News Reel
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on November 20 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below). This month’s meeting agenda includes eight old business items as detailed below. 700.00.53 Procedure for the Independent Assurance Program(UP FOR VOTE) Major Re-Write based on…
Read MoreThe WVDOH Standards & Manuals Committee’s next meeting will be held in person on November 6, 2024, at 9:00a.m. in Room 820 in Building 5 of the WV Capitol Complex, 1900 Kanawha Blvd. E., Charleston, WV. For those unable to attend in person please join via Google Meet, details below. Copies of the proposed changes for the meeting are attached or available through the following link(s) – November Packet. The Standards Committee meeting will consist…
Read MoreWVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
Read MoreUPDATED (2024-10-15) Virtual Meeting links added In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106 – Control of Materials and MP 109.00.21 Sampling & Testing Documentation, projects let after January 1st, 2024, industry is required to enter project testing data and results into the WVDOH’s project tracking system called AASHTOWare Project (AWP). To assist industry users on how to utilize the system and learn how to enter sample data the WVDOH has…
Read MoreWVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2024 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.2981
Asphalt (Ton) – $576.00
Cement (Ton) – $257.68
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
Read MoreInterstate I-79 reopens southbound following emergency repairs on a 500-foot section near the Goshen Road exit. Shortly after 1pm, Wednesday afternoon (9/18), a tractor-trailer overturned spilling some 4,900 pounds of acid on the roadway destroying the asphalt pavement. Shortly after the law enforcement and the WVDOH closed the interstate and secured an environmental cleanup company to address the acid spill. With the asphalt being severely deteriorated WVDOH brought in Mountaineer Contractors, Inc. along with subcontractors…
Read MoreThe WVDOH announces its October Specifications Committee meeting, which is scheduled for Wednesday, October 2 at 9:00 a.m. at the WVDOH Building 5 Conference Room 820 at 1900 Kanawha Blvd. E., Charleston WV. For those unable to attend in person please join via Google Meet, details below. Critical things to look for in the meeting packet: Civil Rights and Labor Special Provision – A SP is in committee which will require contractors and subcontractors to…
Read MoreThe WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on September 18 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below). This month’s meeting agenda includes five old business items, including Buy America Waiver Guidelines Quality Control Plans, Inspector Certification Program, and the WVDOHs Independent Assurance…
Read MoreRegister Here APAWV members be sure to register for the 42nd Annual Fall Meeting being held October 10-13, 2024. Please note that the room rates for The Resort at Glade Springs are set to increase after September 8th, upon the closing of our initial rooming block, please remember to make your reservations ASAP! Contact Glade Spring Reservations Desk at (877) 814-7316 to book your lodging and be sure to mention the Asphalt Pavement Association of…
Read MoreWVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2024 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.3525
Asphalt (Ton) – $588.00
Cement (Ton) – $210.23
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
Read More