WVDOH Specification Committee – May 7, 2025

The WVDOH announces its May Specifications Committee meeting, which is scheduled for Wednesday, May 7 at 9:00 a.m. at the WVDOH Building 5 Conference Room 820(Technical Support) at 1900 Kanawha Blvd. E., Charleston WV. For those unable to attend in person please join via Google Meet, details below.
Critical things to look for in the meeting packet (this is not all encompassing please review the entire packet):
- Section 651-Furnishing and Placing Soil, Section 652-Seeding and Mulching & Section 715.25-715.32
- Section Rewrite updating the requirements for seeding and mulching.
- 642.6-Silt Fence & 642.7-Method of Measurement (Table 642.7.1)
- Section Rewrite
- 679.2.2-Specialized Concrete Mix Design and Testing
- The revision update replaces the rapid chloride permeability test with the surface resistivity test and requirements.
- SP106-Build America Buy America and Section 106.1-Source of Supply and Quality Requirements (BUY AMERICA))
- The revision adds the definition of manufactured products and adds language on State and/or Federal use of Manufactured products. The final assembly of the manufactured product shall be manufactured in the United States.
- 109.7-Payment for Material on Hand
- The revision allows for payment to steel fabricators for the raw steel for which they will have to pay for well in advance of when they will be paid for the finished product.
- 410.7.1.5 - PWL Bond Strength
- Revisions waive negative price adjustments given a proper tack coat application as per a contractor’s QCP.
- SP601-Mass Concrete & Supporting Specifications
- Section rewrite based on WVU research. Currently being held in committee which revisions by WVDOH are being made.
- WV Jobs Act SP
- Revision updates violation language from 2018, raising penalties to prime contractor and subcontractors failing to meet requirements of West Virginia Jobs Act.
- ($100/day of violation is being revised to $250/employee outside requirements/day)
- 109.20.1-Electronic Ticket Delivery
- Adds steel superstructure components (pre-fab or construct on site) and stay-in-place forms.
- 401.13.3 and 403-Joint and Crack Sealing of Asphalt Pavements
- The revision adds requirement for sealing all longitudinal joints regardless of achieved density
- 420.2.2-Fine Aggregate,2FA and 3FA
- The revision shifts Type 2FA requirements for Sieves No. 8 and No. 30 to ensure there are no conflicts with the existing aggregate being used within West Virginia.
- 601.3.2.1-Concrete Consistency
- The revision clarifies that a superplasticizer may be used in field adjustments regardless if it was included in the original approved mix design.
A copy of the agenda and proposals will be posted online at the Specifications Committee Website HERE. Comments are requested on these Specification changes and Project Specific Special Provisions and may be submitted directly to Janie Adkins, Assistant Specifications Engineer at the WVDOH at janie.m.adkins@wv.gov or DOHSpecifications@wv.gov, or to the CAWV Specifications Committee Chairman, Chad Miller, at cmiller@jfallenco.com, and John Crane at jcrane@asphaltwv.com. Please share comments in advance of the meeting to ensure they can be reviewed/discussed at the meeting.
TO JOIN VIA GOOGLE MEET
To join by phone dial +1 484-841-5385 | PIN: 999594806
Past Posts
Register Here APAWV members be sure to register for the 42nd Annual Fall Meeting being held October 10-13, 2024. Please note that the room rates…
Jodi started at Kelly Paving, Inc in 2002 as a Flagger through the WV Laborers Apprentice Program. In 2019, She was promoted to a Foreman position as Traffic Control Supervisor. In 2023, she became a Milling Foreman. She said the main reason she got into Construction was her entire family worked in the industry. Jodi brings an enthusiastic and positive attitude to work every day. She does an excellent job uniting everyone from hired haul drivers to subcontractors to achieve the common goal and is an instrumental part in making things happen out on the road. Jodi says, “I tell everyone the only thing I would have done differently was I would have started this career sooner. I love my job!” She does an excellent job uniting everyone from hired haul drivers to subcontractors to achieve the common goal. You will never find her without a smile on her face.
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2024 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.3525
Asphalt (Ton) – $588.00
Cement (Ton) – $210.23
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
The WVDOH released their annual Purchase Order Contracts for asphalt materials. Both contracts will accept bids until September 19th. See details for both Purchase Order…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on September 11, 2024, at 9:00a.m. in Room 820 in Building 5…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on August 20 at 10:00 a.m. at the Materials Control Soils and Testing…
AUGUST 27, 2:00-3:30 PM EASTERN TIME Register now! This webinar is RCEP-eligible for live attendance. This insightful webinar focuses on navigating the complexities of Balanced…
Register Here We hope you are planning to join us for our 42nd Annual Fall Meeting on October 10 – 13, 2024, at The Resorts…
Joined by nearly 100 attendees the Women of Asphalt West Virginia Chapter (WofA-WV) welcomed Governor Jim Justice at their 2nd annual luncheon held at the…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of August 2024 as shown below.
Period – 8/1/2024
#2 Fuel (Gal) – $2.5364
Asphalt (Ton) – $595.00
Cement (Ton) – $199.21
Historical and individualized information can be found at: https://www.asphaltwv.com/index/