The WVDOH announced an upcoming Materials Procedures (MP) Committee meeting.  The meeting will be held in person on April 16 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV.  For those unable to attend in person please join via Google Meet (see details below).

This month’s meeting agenda includes ten old business items as detailed below.

  • 106.10.50 WVDOH Buy America Acceptance Guidelines(UP FOR VOTE)
    • Removes waiver for Manufactured Materials in anticipation of FHWA Update.
  • 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
    • Process for creating approved list for Density/Moisture Devices
  • 307.00.50 - Guide for Quality Control and Acceptance Plans for Subgrade, Base Course, and Aggregate Items
    • Addition of Trail Surface Aggregate
  • 679.02.99 - Calibration of Concrete Continuous Mobile Mixer
    • New Document. Kiana to discuss.
  • MA-1 - Operating and Emergency Procedures for Nuclear Gauges
    • Reconfirmation/update of practices
  • ML-25 - Procedure for Monitoring the Activities Related to Sieve Analysis of Fine and Coarse Aggregate
    • Reconfirmation/update of practices
  • 711.03.23 - Mix Design for Portland Cement Concrete
    • Replacing the Rapid Chloride Permeability test with the Surface Resistivity Test, and the SAM testing requirements for Mix Design approval.
  • 601.00.49 - Method of Test for Determining the Condition of Concrete Bridge Decks
    • New Document. Kiana to discuss.
  • 700.00.54 - Procedure for Evaluating Quality Control Sample Test Results with Verification Sample Test Results
    • Significant Updates, Dan to discuss.
  • 106.03.50 - General Information Guide for Technician and Inspector Certification Program (TICP)
    • Changing 3 to 5 years for certification, adds apprentice program.

A single new business items will also be presented to the committee:

  • 700.00.50 Method for Acceptance of Compaction Testing
    • Addition of Definition

The agenda also includes no MPs with editorial changes

For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.

TO JOIN VIA GOOGLE MEET:

https://meet.google.com/qaq-awvh-wcv

To join by phone: 929-329-2405 --- PIN: 516138058

The Next MP committee will be held at MCS&T on June 18, 2025 at 10:00 AM.

Past Posts

WVDOH November Material Indices

By JCrane | 2024/10/31

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.

Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28

Historical and individualized information can be found at: https://www.asphaltwv.com/index/

WVDOH Offer AWP Training Schedule for Industry Sample Data Entry

By JCrane | 2024/10/17

UPDATED (2024-10-15) Virtual Meeting links added In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106 – Control of Materials and MP 109.00.21…

WofA Spotlight – Olivia Rees

By JCrane | 2024/10/11

Olivia fell into the asphalt industry while still in college, and got a summer internship working in a quality control lab. She says, “I loved this job so much I immediately joined the Shelly Company full time after I graduated in 2019. During my time there I worked in construction scheduling and mainly estimating. I was fortunate to work with many crews and be exposed to many parts of the company that gave me appreciation for the industry as a whole.”

WVDOH October Material Indices

By JCrane | 2024/10/01

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2024 as shown below.

Period – 10/1/2024
#2 Fuel (Gal) – $2.2981
Asphalt (Ton) – $576.00
Cement (Ton) – $257.68

Historical and individualized information can be found at: https://www.asphaltwv.com/index/

APAWV Members Get I-79 South Reopens After Acid Spill

By JCrane | 2024/09/20

Interstate I-79 reopens southbound following emergency repairs on a 500-foot section near the Goshen Road exit.  Shortly after 1pm, Wednesday afternoon (9/18), a tractor-trailer overturned…

WVDOH Specification Committee – October 2, 2024

By JCrane | 2024/09/20

The WVDOH announces its October Specifications Committee meeting, which is scheduled for Wednesday, October 2 at 9:00 a.m. at the WVDOH Building 5 Conference Room…

MP Committee Meeting – September 18, 2024

By JCrane | 2024/09/16

The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on September 18 at 10:00 a.m. at the Materials Control Soils and…

42nd Annual APA Fall Meeting

By JCrane | 2024/09/06

Register Here APAWV members be sure to register for the 42nd Annual Fall Meeting being held October 10-13, 2024. Please note that the room rates…

WofA Spotlight – Jodi Johnson

By JCrane | 2024/09/01

Jodi started at Kelly Paving, Inc in 2002 as a Flagger through the WV Laborers Apprentice Program. In 2019, She was promoted to a Foreman position as Traffic Control Supervisor. In 2023, she became a Milling Foreman. She said the main reason she got into Construction was her entire family worked in the industry. Jodi brings an enthusiastic and positive attitude to work every day. She does an excellent job uniting everyone from hired haul drivers to subcontractors to achieve the common goal and is an instrumental part in making things happen out on the road. Jodi says, “I tell everyone the only thing I would have done differently was I would have started this career sooner. I love my job!” She does an excellent job uniting everyone from hired haul drivers to subcontractors to achieve the common goal. You will never find her without a smile on her face.

WVDOH September Material Indices

By JCrane | 2024/08/30

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2024 as shown below.

Period – 9/1/2024
#2 Fuel (Gal) – $2.3525
Asphalt (Ton) – $588.00
Cement (Ton) – $210.23

Historical and individualized information can be found at: https://www.asphaltwv.com/index/