WVDOH Offering AWP Payroll and Subcontractor Payment Data Entry Training
For all WVDOH projects let after October 8th, 2024(Initial Announcement), industry is required to enter certified payroll and subcontractor payment data into the WVDOH’s project tracking system, AASHTOWare Project (AWP). To assist industry users on how to utilize the system and learn how to enter required data the WVDOH has announced a schedule of trainings being held virtually. Please see the corresponding lists and links to the online training below. WVDOH will also provide in-person training upon request.
Industry Online Training Dates
- December 04, 2024, at 1:00 PM – Payroll Spreadsheet
- Meeting link: https://meet.google.com/xtk-shmh-tri?hs=224
- Join by phone: 1-484-602-9615 PIN: 287247282
- December 11, 2024, at 1:00 PM – Manual Payroll Input
- Meeting link: https://meet.google.com/stg-ecmm-zin?hs=224
- Join by phone – 1-419-901-8820 PIN: 331857631
- December 18, 2024, at 1:00 PM – Subcontractor Payment
- Meeting link: https://meet.google.com/izc-qiba-pni?hs=224
- Join by phone – 1-929-266-3478 PIN: 849708837
- January 08, 2025, at 1:00 PM – Advancing Subcontractor Payrolls
- Meeting link: https://meet.google.com/nhp-jzbj-eej?hs=224
- Join by phone – 1-650-535-0360 PIN: 998814114
- January 22, 2025, at 1:00 PM – Subcontractor Payment
- Meeting link: https://meet.google.com/egd-mzuy-qet?hs=224
- Join by phone – 1-6625272056 PIN: 144700628
- January 29, 2025, at 1:00 PM – General Q & A Session
- Meeting link: https://meet.google.com/wqy-yeug-mjj?hs=224
- Join by phone – 1-669-999-0241 PIN: 309373319
Prior to these training sessions, we encourage you to review preliminary training resources on the Civil Rights Compliance Division webpage here(some linked below as well). In addition, if you have not done so, utilize the following form to to get those in your company tasked with data entry added as a registered user for AWP (AASHTOWare Project Resources: External User CRL Request Access Form and External User CRL Login Website). Please note each individual should have their own login credentials and account information may not be shared.
If you need assistance with AWP login or have any questions regarding the training, contact Shane McComas with WVDOH at Shane.M.McComas@wv.gov.
Certified Payrolls Information
Certified payroll functionality in CRL allows payrolls to be imported and tracked in a singular database. Various payroll components are calculated and checked in CRL, including pay rates, fringe benefits, hours worked, etc. There are three (3) methods to enter payrolls in CRL:
2.Excel Spreadsheet and Conversion – recommended for smaller companies with no payroll system (≤50 employees);
3.XML Export from your Company's Payroll System – Recommended and preferred method for importing payrolls; takes the longest to develop but is the quickest method to import once developed.The below resources may be used to develop an XML export from your payroll system. Limited access to a test environment of AWP CRL may be provided upon request to evaluate if the export developed from your payroll system is valid. If your company is using a bought payroll system (“off the shelf"), please provide them with the below resources:
XML Resource Kit from AASHTOWare (Template)
XML Validation Tool from AASHTOWare
WVDOT Excel Payroll Spreadsheet with Craft and Labor Codes
Computer Based Trainings (CBT)
Entering Payrolls
Managing and Reviewing Payrolls
Quick Reference Guides (QRG)
Managing Payrolls
Subcontractor Prompt Payment Trainings
WVDOT requires all prime contractors to enter prompt payment into AWP CRL for all federally funded contracts. Resources on how to enter a prompt payment entry, how to sign prompt payments, and how to review prompt payment entries are provided below.
Computer Based Trainings (CBT)
Managing Subcontract Payments
Quick Reference Guides (QRG)
Managing Subcontract Payments
Past Posts
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of June 2024 as shown below.
Period – 6/1/2024
#2 Fuel (Gal) – 2.4089
Asphalt (Ton) – $597.00
Cement (Ton) – $191.88
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
UPDATE – The June Specifications Committee will only be held virtually this month… please use the link below to join the meeting at 9:00am. The…
With recent changes to WVDOH specifications, all projects let after January 1, 2024 require contractors to enter project testing data and results into the WVDOH’s…
The Asphalt Pavement Association of West Virginia (APAWV) is heading toward Beckley, West Virginia for their Fall Conference. This year the asphalt industry will be…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on May 15 at 10:00 a.m. at the Materials Control Soils and Testing…
In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106‑Control of Materials and MP 109.00.21 Sampling & Testing Documentation, projects let after January…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on April 24, 2024 at 10:00 a.m. at the Materials Control Soils and…
National Work Zone Awareness Week (NWZAW) is April 15-19, 2024. NWZAW highlights the deadly dangers of inattention at highway work areas. Join in the activates…
During the luncheon at the 44th Annual Asphalt Paving Conference, John Crane, Executive Director of Asphalt Pavement Association presented the Asphalt Industry Stewardship Award. Crane…
Over 200 individuals from industry, WVDOH, and academia joined together for the 44th Annual Asphalt Paving Conference and WVDOH Statewide Asphalt Preconstruction Meeting held in…