MP Committee Meeting – November 20, 2024
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on November 20 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes eight old business items as detailed below.
- 700.00.53 Procedure for the Independent Assurance Program(UP FOR VOTE)
- Major Re-Write based on FHWA guidance
- 106.10.50 WVDOH Buy America Acceptance Guidelines
- Removes waiver for Manufactured Materials in anticipation of FHWA Update.
- 106.10.51 WVDOH Buy America Waiver Guideline(UP FOR VOTE)
- Splitting out from 106.10.50 due to length and complexity. Outlines waiver process for Buy America Materials. Pending incorporation of updates from FHWA
- 603.10.40 Inspection and Acceptance Procedures for Prestressed Concrete Bridge Members(UP FOR VOTE)
- Add E-Ticketing
- 720.10.01 Guide for Using a High-Speed Inertial Profiler to Measure the Longitudinal Profile of Pavement(UP FOR VOTE)
- Minor Updates/Reconfirmation
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
- Process for creating approved list for Density/Moisture Devices
- 700.00.54 Procedure for Evaluating Quality Control Sample Test Results with Verification Sample Test Results(UP FOR VOTE)
- Modernization/Update of MP.
- 106.03.51 Policy for Materials Certification Reciprocity(UP FOR VOTE)
- Adds PCC technician reciprocity.
- All Quality Control MPs(UP FOR VOTE)
- Removes Industry testers list from QC
- 106.03.50 General Information Guide for Technician and Inspector Certification Program (TICP)
- General Updates including Cert Board, and update of new classes. Removal and incorporation of handbook
The agenda also includes three MPs with editorial changes:
- 212.01.21 Test Method for Unconfined Compressive Strength of Rock Core Specimens
- 212.02.20 Procedure For Determining a Reduced Unit Price to Be Paid for Select Material for Backfilling Which Does Not Conform to Grading Requirements of Governing Specifications
- 401.07.21 Sampling Compacted Asphaltic Mixtures from The Roadway
Five new business items will also be presented to the committee:
- 109.00.21 Basis For Charges for Non-Submittal of Sampling & Testing Documentation By The Established Deadline
- References new document – MP 109.00.22 listed next.
- 109.00.22 Procedure for the Submission and Documentation of Quality Control Test Results
- Defines the submission of QC samples by the contractor.
- 604.02.40 Inspection and Acceptance Procedures for Precast Concrete Products
- Revised the cylinder fabrication frequency for dry cast concrete in Section 4.3.2
- 712.21.26 Procedure For Determining the Random Location of Compaction Tests
- Previously approved MP with minor updates.
- 106.00.03 Guidelines For Establishing and Maintaining Approved Product Lists of Materials, Systems and Sources
- Removal of NTPEP reference.
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
http://meet.google.com/apa-rvti-ndx
To join by phone: 1 315-925-5747 --- PIN: 590164583
The Next MP committee will be held at MCS&T on December 18, 2024 at 10:00 AM.
Past Posts
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
UPDATED (2024-10-15) Virtual Meeting links added In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106 – Control of Materials and MP 109.00.21…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2024 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.2981
Asphalt (Ton) – $576.00
Cement (Ton) – $257.68
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
Interstate I-79 reopens southbound following emergency repairs on a 500-foot section near the Goshen Road exit. Shortly after 1pm, Wednesday afternoon (9/18), a tractor-trailer overturned…
The WVDOH announces its October Specifications Committee meeting, which is scheduled for Wednesday, October 2 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on September 18 at 10:00 a.m. at the Materials Control Soils and…
Register Here APAWV members be sure to register for the 42nd Annual Fall Meeting being held October 10-13, 2024. Please note that the room rates…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2024 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.3525
Asphalt (Ton) – $588.00
Cement (Ton) – $210.23
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
The WVDOH released their annual Purchase Order Contracts for asphalt materials. Both contracts will accept bids until September 19th. See details for both Purchase Order…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on September 11, 2024, at 9:00a.m. in Room 820 in Building 5…