Certified Emissions Statement (CES) Program – Deadline March 1, 2024
The Asphalt Pavement Association is pleased to offer, for the 30th year, a voluntary technical services program to assist in completing the 2023 Certified Emissions Statement. Emission point sources, such as facilities/plants/activities, are required to submit their CES Emission Inventory electronically using the Division of Air Quality’s (DAQ) State and Local Emissions Inventory System (SLEIS) computer program no later than March 1, 2024.
The CES Emission Inventory is submitted electronically with the existing facility SLEIS account obtained in previous years. After the SLEIS submittal, DAQ will send the facility a Certified Emissions Statement Invoice (CESI) containing emissions information based on the SLEIS reporting. The facilities will then verify the information, sign the CESI forms, and return them to DAQ with a check for the operating fee.
Similar to last year, DAQ is expected to require the inclusion of the condensable particulate matter (PM) fraction of PM. Condensable PM is the fraction of PM which is vaporous in a vent stack that becomes solid in the atmosphere. If your facility has fuel burning emissions, PM condensables may impact the total PM emissions.
For each participant who requests the service, Potesta & Associates, Inc. (POTESTA) will send a request for information required to prepare the annual emissions which will still be estimated the same way as before unless there have been revisions to the site permit.
Potesta & Associates, Inc. (POTESTA) is offering the following service to members/participants of the Asphalt Pavement Association of WV at reduced group rates.
POTESTA, with the permission of the facilities, will prepare the emissions estimate and enter them into the SLEIS account based on requested information from each site for 2023 OY emissions data. The CES information must be submitted to DAQ prior to the due date of March 1, 2024.
If you would like to have POTESTA perform these services for your company, please fill out the attached “Service Request Form,” found HERE, and mail, fax, or email to POTESTA at the address shown on the form.
COST SCHEDULE
POTESTA is prepared to commence work on this project immediately upon receipt of Service Request Form. POTESTA proposes to perform this work on a lump-sum basis as shown in the following table. No additional costs will be incurred without your prior approval.
Facility | APA-WV Member Cost* | Non APA-WV Member Cost* |
POTESTA has previously completed CES and there have been no changes to the air permit. | $1,050 | $1,500 |
POTESTA has NOT previously completed CES or an air permit revision requires updating emissions calculations. | $1,500 | $2,150 |
*Costs are quoted on a per facility basis and POTESTA needs to be notified about air permit revisions.
Member rates shown for services are based on actual costs for having the service performed. The APA-WV is charging non-members a higher rate to help offset related legal and environmental consulting fees. Non-members who join the APA-WV this calendar year will be given credit for the difference in rates toward their dues.
Click HERE for the POTESTA's service request form to complete your CES inventory for 2023.
Past Posts
For all WVDOH projects let after October 8th, 2024(Initial Announcement), industry is required to enter certified payroll and subcontractor payment data into the WVDOH’s project…
The Asphalt Pavement Association of West Virginia is offering an asphalt mix design course which will cover both Marshall and Superpave Mix Design methods. These…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on November 20 at 10:00 a.m. at the Materials Control Soils and…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on November 6, 2024, at 9:00a.m. in Room 820 in Building 5…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
UPDATED (2024-10-15) Virtual Meeting links added In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106 – Control of Materials and MP 109.00.21…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2024 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.2981
Asphalt (Ton) – $576.00
Cement (Ton) – $257.68
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
Interstate I-79 reopens southbound following emergency repairs on a 500-foot section near the Goshen Road exit. Shortly after 1pm, Wednesday afternoon (9/18), a tractor-trailer overturned…
The WVDOH announces its October Specifications Committee meeting, which is scheduled for Wednesday, October 2 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on September 18 at 10:00 a.m. at the Materials Control Soils and…